Seventh Group Visit
For this visit the group headed upstream to the Hunter Street Bridge which had a large amount of debris on the centre support. This could have easily caused the entire bridge to become blocked if more debris had come down stream.
A large tree Trunk removed from the bridge is now in the mill stream where it can do less damage, the Heron is very happy to have a new vantage point for watching the fish from.
Various items have been removed from various locations during this period.
Three cones under the skatepark footbridge, along with a shopping trolley, just visible in the top-middle of the image.
Total removed from the area beneath the skatepark footbridge, a shopping trolley, windscreen wiper, mud flap, road closed sign, four road cones and other items of rubbish.
Two wheelbarrows found themselves stranded in the river and required rescuing on Tuesday.
A large piece of board in the river, downstream of the footbridge behind the Athletic Football club.
Another cone required rescuing from the river on Monday.
27th April 2025
Thank you to everyone that took part in the event we all had a great time made even better by the sun. A huge thank you to the Flood Action 4 Buckingham team and a big thank you to everyone who came to see us on the day.
Sixth Visit
Further downstream for the FA4B group's sixth visit to the river, this visit was slightly more difficult due to the location, however we still managed to remove a large quantity of organic matter, a road cone and other items as shown in the pictures.
Fifth Visit
Further downstream for the FA4B group's fifth visit to the river, this visit we removed a large quantity of tree matter and other items as shown in the pictures. Previously one of the group had moved a couple of items that were across the river at Ford Street. Even earlier in the week another member of the group removed a large quantity of garden waste that had fallen in the river upstream of the Fishers Field weir.
Passing visit
A passing clearance, one of the FA4B group with assistance from a river warden removed two road cones a scooter and a sandbag from the river, upstream of the Tingewick Road bridge.
Random passing visit
A random clearance, one of the FA4B group having concerns due to the build up of logs and branches in the backwater by the bridge.
Fourth Visit
Further downstream for our fourth visit to the river, removed more empty bottles, some hanging branches and other rubbish as shown in the pictures. We will need to return at some point to dig out the metal sign and post visible in the after picture.
Third Visit
Further downstream for our third visit to the river, removed more empty bottles, some dangerous hanging branches and other rubbish as shown in the pictures.
Second Visit
This area was our second visit to the river, removed numerous empty bottles, two road cones, branches and other rubbish shown in the trolley.
First Visit
This area was our first visit to the river, removed a chair, road cone, shopping trolley and a bike! Unfortunately no after shots.